ABU DHABI DUBAI UAEinfo@mgrorotic.com
Magnus Global Aviation & Robotics — MG Robotic

SERVICE OVERVIEW

A considered approach to your requirements.

Tank cleaning begins with understanding the material inside the vessel, its access points and the conditions under which the work will be carried out. A non-man-entry approach uses remotely operated equipment to support cleaning while reducing the need for personnel to work inside a confined space.

Non-Man-Entry Tank Cleaning in UAE

For projects in the UAE, the review brings together site access, asset conditions and the coordination needed between your operating and maintenance teams. Share the location of the work, the intended outcome and any documentation available so a suitable scope can be developed.

Technical Approach

Tank assessment

The planning stage reviews tank geometry, available access, previous contents, deposit characteristics and isolation requirements. These inputs guide the selection of equipment and a practical sequence of work.

Sludge management

A cleaning plan considers how deposits will be mobilised, transferred and contained. Recovery, separation and disposal routes must be agreed against the material characteristics and the receiving facility requirements.

Remote equipment integration

Pumps, hoses, cameras and handling arrangements are assessed as a connected system. The selected configuration must be compatible with the vessel, the material and the approved work conditions.

Completion and records

Agreed completion criteria, inspection access and reporting requirements are established before work starts. Cleaning records help the customer plan the next maintenance or inspection stage.

Project Parameters

Planning considerations for non-man-entry tank cleaning
Planning inputsTank geometry, access and deposit assessment
OperationRemotely operated equipment selected for the task
Material handlingContainment and transfer planning
HandoverCleaning records and agreed completion checks

Project Development

The scope is developed with your team, from the first requirements discussion through engineering review, integration and handover.

01

Requirements & Feasibility

We review the task, environment, access and operational constraints to define a practical scope.

02

System Design

Equipment, interfaces and working methods are selected around the agreed project requirements.

03

Integration & Testing

The proposed configuration is integrated and reviewed against the agreed validation criteria.

04

Deployment & Support

Handover information, operator guidance and ongoing support requirements are agreed with your team.

Application Areas

Crude and heavy-oil storage

Petrochemical storage tanks

Maintenance preparation

Frequently Asked Questions

Can every tank be cleaned without entry?

Suitability depends on access, internal structures, deposits, tank condition and the available equipment. The approach is established during the initial review.

How is the waste stream managed?

Material characterisation, containment, separation opportunities and approved receiving arrangements are considered in the project plan.

LET’S TALK

Discuss your next project.

Find the right approach for your operational requirements.

Request a Consultation